Hardware Setup
Detailed instructions for installing and connecting JoingAI carrier boards and accessories.
Tools & Materials
- Anti-static wrist strap
- Compatible Jetson module
- Power supply: 12V–24V DC, ≥2A
- FAKRA / coaxial / network cables (per product)
Installation
- Power off the host system and disconnect the power adapter.
- Wear an anti-static wrist strap before handling any board.
- Mount the Jetson module onto the carrier board's high-density connector.
- Secure the module with the screws provided in the kit.
- Connect cameras, displays, and peripherals as defined in the product datasheet.
- Apply power and verify boot behavior.
Mechanical Considerations
- Provide adequate ventilation around the carrier board.
- Avoid mounting near heat sources or in direct sunlight.
- Use grounding screws when the installation environment requires it.
For board-specific pin definitions, refer to the relevant product page under Products.